Replacement of Existing Water Pipelines in Abu Al Abyad Island

We're supplying and constructing about 16.5 kilometers of a large water pipe (OD560), 36.39 kilometers of another size (OD450), 540 meters of a smaller one (OD355), and 3230 meters of an even smaller pipe (OD250) with a specific technical specification (PN10 SDRD17 HDPE Pipeline).

 

 

Client                  :

Category             :

Location              :

Start Year            :

Project Status      :

Completion Year  :

Reach Us

General Construction Company W.L.L

Mussafah 9 PO Box 3338, Abu Dhabi

Contact

[email protected]

+971 2 5554025/6